In the blog.

Formula One Project

[[{"fid":"389","view_mode":"default","fields":{"format":"default","field_locations[und]":"2","field_services[und][18]":"18","field_file_image_alt_text[und][0][value]":"","field_file_image_title_text[und][0][value]":"Working on the Austin US Federal Courthouse","field_image_tags[und]":""},"type":"media","attributes":{}}]]

Shown here are Jose Diaz, Osvaldo Gonzales and Julio Ortiz working on the exterior of the building, installing metal framing. 
Note: Men will be utilizing 100 foot lifts to install metal and exterior rock for the Formula One grand stand.
 
Tags